Getting started.
Framing and plumbing in.
Tiling down, tub in.
Big walk in shower.
Vanities and toilet in. Floors grouted.
Super soaker bath tub. Tile done around the tub and carried to the shower.
Tile carried over the ceiling of the shower. It's all caulked now.
The vanities are from lowes, they were 130$ a piece. The mirrors are from Ikea at 20$ a piece.
Another view. This is the Girls bathroom. There is still a lot of work to be done. Just the small tedious stuff left.